2021-22 Unit Plan
Facilities, Planning and Management

Mission Statement

The purpose of Facilities Planning and Management is to create and maintain a safe, positive and appealing environment that supports student and staff success. Our mission is to increase the quality of services provided and establish metrics to verify the level achieved.

The Facilities Planning and Management (FPM) department of the Butte-Glenn Community College District is responsible for the construction, maintenance and operation of the physical plant of the District. Divisions include Custodial, Construction & Building Maintenance, Grounds, Printing, Shipping and Receiving, Transportation, Bond Management Program, utility management and the technical and clerical staff to support these functions.

The vision of an organization can be subdivided into three parts: Core Values, Purpose, and Mission. The Core Values are the basic beliefs that define us as individuals and thus as an organization. These do not change over time. Purpose is the guiding star that defines the direction the organization will always move toward. The Mission is the immediate challenge to be conquered while moving towards fulfilling the Purpose.

Program Description

The FPM department consists of eight units: Custodial Services, Construction and Building Maintenance, Grounds Maintenance, Printing Services, Shipping & Receiving, Mail Services & Asset Management, Student Transportation, Staff Motor Pool,  Bond Management Program, and Facilities Support Services. There are approximately 70 permanent employees in the department.


Accountability for Previously Funded Items


Accountability Item 1

Increase in Natural Gas and Electricity Cost


Amount: 65754.00
Used For Intended Purpose: Yes
Benefit

Utility cost covered.

Cosmetology and Barbering Center 

• Natural Gas - $1,860 

• Electricity - $2,596

 

Chico Center/Skyway Center

• Natural Gas - $3,000

• Electricity - $3,860 

 

Main Campus  

• Electricity $23,505

• Natural Gas $30,933 



Accountability Item 2

Glenn Center Lease Increase


Amount: 6588.00
Used For Intended Purpose: Yes
Benefit

Lease covered so that program can continuing operating.



Accountability Item 3

Cosmetology Center Lease Increase


Amount: 6542.00
Used For Intended Purpose: Yes
Benefit

Lease covered so that program can continuing operating.



Accountability Item 4

Water, Sewer rate, use and permit


Amount: 3500.00
Used For Intended Purpose: Yes
Benefit

Cost covered.



Accountability Item 5

Air filters for Welding and Manufacturing building. Kinesiology and Athletic Performance Center and Press Box.


Amount: 22132.00
Used For Intended Purpose: Yes
Benefit

Funds will be used to purchase air filters for Welding & Manufacturing Building and Kinesiology & Athletic Performance Center and Press Box  Filters remove particles such as dust and dirt as they pass through the filters.



Student Learning/Administrative Unit Outcomes


        

Standards/Goals for Student Achievement (Instruction Departments)


        

Standards/Goals for Student Achievement (All Other Departments)


        

Strategic Direction


        

Program Review

The following goals from the previous strategic plan and program review and the current status:

• Establish and manage a facilities renewal program. Ongoing.
• Identify safety hazards and develop projects to address unsafe conditions. Ongoing.
• Assist instructional and student service departments with development of their projects. Ongoing.
• Ensure that all District facilities, property and vehicles are in compliance with relevant regulations. Ongoing.
• Track and analyze the District’s utility usage and costs. Ongoing.
• Maintain the Bond Management Program. Ongoing.
• Evaluate job class to ensure a match with District needs and requirements. Ongoing.
• Evaluate 2016 Accessibility Survey and create a corrective maintenance plan. Ongoing.
• 
Evaluate District options to mitigate the effectis of PGE's Public Safety Power ShutoffOngoing.

 


Department Goals


        

Future Development Strategies

Strategy 1 - Facilities Renewal Program

Establish and manage a facilities renewal program.


Initiatives
  • Modeling Sustainability
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

The buildings represent the most valuable physical asset of the District with a current replacement value of approximately $399 million. In addition the utility infrastructure, landscape and hardscape are valuable assets of the District. All of these assets have a predictable rate of deterioration and therefore, the need for systematic renewal of these assets to provide for the future usability for District functions.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 2 - Safety

Identify safety hazards and develop projects to address unsafe conditions.


Initiatives
  • Supporting Student, Faculty and Staff Success
  • Maximizing Resources to Support Student Learning

Supporting Rationale

Some facility deteriorations create unsafe conditions and need to be addressed.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 3 - Analyze Program Needs

Meet with and discuss facility-related programatic needs for instructional and student services departments.


Initiatives
  • Modeling Sustainability
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success
  • Using Data-Informed Processes for Continuous Improvement
  • Maximizing Resources to Support Student Learning
  • Enhancing a Culture of Equity and Inclusiveness

Supporting Rationale

Adaptive use of facility can assist instruction and delivery of student services.   FPM can provide the expertise to assist departments with their augmentation requests.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 4 - Regulations

Ensure that all District's facility, property and vehicles are in compliance with relevant regulations.


Initiatives
  • Maximizing Resources to Support Student Learning

Supporting Rationale

To reduce the District's exposure to liability and potiental regulatory actions.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 5 - Utility Usage

Track and analyze District utility usage and costs, and options to mitigate PGE's Public Safety Power Shutoff.


Initiatives
  • Modeling Sustainability
  • Using Data-Informed Processes for Continuous Improvement

Supporting Rationale

Analyzing the District's utility usage will assist with budgeting for future utility costs, and options to mitigate PGE's Public Safety Power Shutoff.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 6 - Bond Management Program

Maintain the Bond Management Program and reclassify staff to match the department needs to support the Bond Program.


Initiatives
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

Additional Program Managers are needed to support the Bond Program.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: Yes
Supports Program Review Recommendations: No
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 7 - Accessibility Survey

Implement corrective maintenance plan based on 2016 Accessibility Survey.


Supporting Rationale

Correcting the deficiencies identified in the survey will make the campus more ADA accessible.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: No
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Requested Non-Financial Resources

None

Current Financial Resources

None

Augmentation Requests

Original Priority Program, Unit, Area Resource Type Account Number Object Code One Time Augment Ongoing Augment
Description Supporting Rationale Potential Alternative Funding Sources Prioritization Criteria
1 Facilities Planning and Management Operating Expenses $0.00 $13,130.00
Increase budget to cover for rent increase at Glenn Center and Cosmetology and Barbering Center Increase budget to cover for rent increase at Glenn Center and Cosmetology and Barbering Center. GC: $6,588.00 (110002107601000.55611) CBC: $6,542 (110002108300700.55611)
  • Strategic enrollment growth
  • Diversity, equity and inclusion
  • Meeting Vision for Success Goals
  • Addressing Program Review Recommendations
  • Meeting enrollment targets
  • Meeting student achievement goals (Vision for Success Goals)
  • Fostering a Culture of Inclusiveness
  • Strengthening Professional Development
2 Facilities Planning and Management Operating Expenses $0.00 $65,032.00
Increase in Natural Gas and Electricity Cost Chico Center � When PGE implement the time of use rate in March 2021, there will be a 9% increase in electricity prices. The District will need an augmentation for utilities to support the Chico Center for the 21-22 year: � 11.000.210.3.657000.55510 � Electricity - $10,594 Main Campus �Due to the increased square footage of the 9 portables for Technology Swing Space and Scenario Village and when PGE implement the time of use rate in March 2021, there will be a 9% increase in electricity prices, we will need an augmentation for utilities to support the main campus for the 20-21 year. � 11.000.210.1.657000.55510 - Electricity $23,505 � 11.000.210.1.657000.55520 - Natural Gas $30,933
  • Meeting Vision for Success Goals
  • Improving Processes: a. Data and Reporting; b. Internal Communications
3 Facilities Planning and Management Operating Expenses 110002101651001 55890 $0.00 $3,000.00
Groundwater Monitoring Report and Evaluation New regulations required by the State Water Quality Control Board annual groundwater monitoring report in order to maintain the required Waste Water Treatment Plant permit. The report shall contain an analysis of groundwater data collected during the year, and a general evaluation of any impacts the wastewater discharge is having on the groundwater quality. This report is required to be conducted by a third party entity that holds the proper environmental license. Maintenance is recommending to contract with NorthStar to prepare and submit these documents to the State Water Quality Control Board.
  • Health/Life/Safety
4 Facilities Planning and Management Operating Expenses 110002101651001 $23,575.00 $0.00
Data Collection for Permit to Clean Creek Required data collection to apply for permits to perform cleaning in the creek.
5 Facilities Planning and Management Operating Expenses $73,791.00 $0.00
Clear Creek Maintenance Plan Cost is for consultant to develop a maintenance plan for the District on Clear Creek and obtain proper maintenance permit to clean the creek.
  • Addressing Program Review Recommendations
  • Meeting Vision for Success Goals
6 Facilities Planning and Management Facilities 110002101651001 56220 $350,000.00 $0.00
Scheduled Maintenance Allied Health Lighting Replacement LED The annual inspections showed replacement is needed.
  • Scheduled Maintenance (Facilities)
  • Health/Life/Safety
  • Meeting Vision for Success Goals
7 Facilities Planning and Management Facilities 110002101651001 56220 $30,000.00 $0.00
Scheduled Maintenance Lighting Replacement LRC The annual inspections showed replacement is needed.
  • Scheduled Maintenance (Facilities)
  • Health/Life/Safety
  • Meeting Vision for Success Goals
8 Facilities Planning and Management Facilities 110002101651001 56220 $30,000.00 $0.00
Schedule Maintenance Replace Handicap Actuators LRC The annual inspections showed replacement is needed.
  • Scheduled Maintenance (Facilities)
  • Health/Life/Safety
  • Meeting Vision for Success Goals
9 Facilities Planning and Management Facilities 110002101651001 56220 $150,000.00 $0.00
Schedule Maintenance Restroom Renovation Mechanized Agriculture The annual inspections showed restoration is needed.
  • Scheduled Maintenance (Facilities)
  • Health/Life/Safety
  • Meeting Vision for Success Goals
10 Facilities Planning and Management Operating Expenses $0.00 $0.00
New Glenn Center- Utility, Water, Weed Control and Pest Cost The new Glenn Center will come online in September 2022. Utility, water, weed control will need to be funded. Waste disposal, recycling and hazardous waste will need to be funded. Current services are being paid for by the property owner. The building will require annual fire alarm and sprinkler system and backflow preventer inspections. Ongoing cost is $39,500. - Quarterly weed control by detention pond $1,900 - Semi-annual weed control $3,300 - Pest $1,200 - Water $3,500 - Electric $9K - Natural gas $6K - Waste disposal, recycling and hazardous waste $5,600 - Annual fire alarm and sprinkler system and backflow preventer inspections. Total ongoing cost is $9K ($7K for fire alarm and sprinkler system inspection and $2K for backflow preventer inspections)
  • Diversity, equity and inclusion
11 Facilities Planning and Management Facilities 110002101651001 56220 $51,385.00 $0.00
Arts Adult Changing Table Add an adult changing table to the Arts Restroom. This is requested by the Diversity Committee.
  • Diversity, equity and inclusion
  • Meeting Vision for Success Goals
  • Closing Equity Gaps
  • Meeting student achievement goals (Vision for Success Goals)